Temp Traffic Control Plan on E. Wash Nov 7-14
FYI:
Notice of Temporary Traffic Control Plan
E.washington street
from division st. to S. state st.
7 AM to 7 Pm, saturday november 8 through friday november 14, 2008
Location and Limits of Affected Area:
E.Washington Street, From Division St. to State St.
Description of Construction:
To dismantle and remove the tower crane from the construction site.
Temporary Construction Traffic Control Plan:
Eastbound through traffic will be routed north on Division St. to Huron Street, east on Huron St to State St., south on State St to E. Washington Street. Westbound through traffic will be maintained at all times.
The contractor will open the road to two way traffic at the end of each work day. The detour will then be reset each morning.
Pedestrian Traffic
Pedestrian traffic will be maintained throughout the project on the south side of E. Washington Street. Access to all businesses will be maintained at all times.
Project Contacts:
City of Ann Arbor
Troy Baughman, Project Engineer, (734) 997-1695
David Clemons, Technician Supervisor, (734) 323-7942
John T. Brink, Technician, (734) 323-3893
Granger Construction
Tim VanAntwerp, Construction Manager, (734) 994-0675
Tom Owens, Construction Superintendant, (517) 937-9499
Connelley Crane Rental Corp.
Tim Roy, Project Representative, (313) 999-3095